The following are completed Church projects.

Riverside Grace Brethren Church

Project Name

Riverside Grace Brethren Church
Riverside Christian Academy

Location

Davidsville, Pennsylvania, 15928

Description

This building is the first phase of a three-phase master building plan. The first phase building is designed to provide the following:

  1. 290 seat monumental Sanctuary space with skylight
  2. gymnasium with regulation basketball court
  3. classrooms divisible for Sunday School use
  4. office areas for church and school usage
  5. kitchen facilities

Energy cost and energy conservation were major considerations in planning this building. This resulted in a compact building plan, careful use of fenestration, super-insulation, a free cooling ventilation system, day lighting of Sanctuary, zoned HVAC, and the use of coal fueled boiler.

The structure was designed to alter the gymnasium and Sanctuary area into two floors in future expansion. Building cost studies resulted in choosing the exterior skin and structure of split face concrete block and a roof construction of steel open-web joist, metal deck, insulation board, and single-ply membrane roofing.

Data

16,147 sq. ft.
 

 

Project Name

Our Mother of Sorrows
Church and School

Location

415 Tioga Street
Johnstown, Pennsylvania, 15905

Description

Phase I - Alterations to School, Parish and Convent Building

Phase II - Church Renovations. The two phases of this project included improvements to four buildings of the Church's campus: the Church, the School, the Rectory and the Convent. Various renovations to the Church and School were made to comply with building codes. Each of the buildings was investigated for maintenance needs and desired functional improvements. Lighting and esthetic enhancements were considered as well. The resulting project included: Sanctuary lighting, storm window installation, restroom addition to Church, door replacements, slate and limestone flooring for Church building, roof replacements, sidewalks and curbs, and decorative paver areas.

Contractors

Phase I:
Laurel Highlands Group, Inc.
P.O. Box 642
Johnstown, Pennsylvania, 15907

Phase II:
Burgo Construction, Inc.
726 Glenwood Ave.
Johnstown, Pennsylvania, 15905
 

The following are also Church projects that have been completed.

Armagh United Methodist Church
  • Additions and Alterations to Classrooms
Church of the Open Door
  • Gymnasium Addition and Renovations
Kingwood Church of God
  • Additions and Renovations
  • New Steeple
Maple Spring Church of the Brethren
  • Elevator Addition
Our Mother of Sorrows
  • 1996 Alterations - School, Parish and Convent
  • 75th Anniversary Renovations Study
  • Church Interior Lighting and Finishes
  • Church Reroofing
  • New Playground
  • School Kitchen, Sidewalks and L&I Updates
St. Anthony's Church, Windber
  • Entrance and Stair Well Addition
Somerset Christian Missionary Alliance Church
  • Modifications to New Building
Westmont Church of the Brethren
  • Sanctuary Reconstruction
Westmont Presbyterian Church
  • Lobby and Elevator Addition
  • Interior Renovations
  • Window Replacement
Westmont United Methodist Church
  • Handicap Accessibility Studies
Zion Lutheran Church
  • Reroofing and Interior Renovations
 

Home